|  Dozer on his new home ground
|  Time to practice on level ground
|  Dozer helps pile dropped timber for the chipper
|
 Starting prep for Dozer's Shed
|  Carefull layout and hand work
|  Making access for electric line
|
 Finishing augar dug holes by hand
|  Mike digs power line trench from Machinery Barn to Cabin
|  Finished trench |
 Great help from Cody & Randy pouring the piers
|  Pouring piers
|  Setting post brackets in concrete
|
 Empty contrete bags represent >3500 pounds of dry mix
|  Not pretty but the post brackets are level and straight
|  Temporary electricity outlet at barn
|
 Temporary, intermittent power connection at Cabin
|  High of 21 degrees & 8-1/2 inches of snow slowed us a bit
|  11/29 work resumes as Shawn & Greg start above ground work. Greg plumbs a corner post.
|
 Shawn & Greg hoist a beam
|  Shawn lifts end beam. Glad we got some help!
|  Greg places wall studs
|
 Wall siding
|  Roof trusses
|  Walls up, roof sheathed, sun about to set
|
 11/30 Shawn nails end wall (ends open below beam)
|  Windows in, vertical wall trim
on, roof underlayment on
|  Eave trim
|
 Metal roof & trim almost
finished
|  11/30 "Dozer" spends 1st night in new shed. (Greg returned 12/3 to finish last shed items)
|  1/7/14 it warmed up enough to stain. Zane applies finishing touches
|
 Dozer Shed blends in pretty well behind Machinery Barn
|  With luck, power to Shed will Flow through that wire in conduit from the Barn
|  Lets see - do we really need that many wires in 1 switch box?
|
 Pulling wires to subpanel site in Barn
|  Securing cable in Barn
|  Happy dance after Barn wiring passed continuity test
|
 EXTREMELY temporary Shed circuit test connection (Shed circuit passed too)
|
|
|
|
|
|
|
|
|
|
|
|